Commercial drywall finisher on stilts skim-coating a twelve-foot wall in a large office building under construction, golden hour light catching the blade, steel studs and stacked gypsum board visible in the background
Commercial Drywall · Steel Framing · Level 5 Finish

We BuildWhat YouDon't See.

Steel framing and gypsum board — hung at forty feet, finished to Level 5, delivered on schedules that general contractors actually trust.

4.2M+Sq Ft Completed
97%On-Schedule Rate
18+Years Commercial
Level 5Finish Standard
Scroll
0M+ sq ft
Board Installed
Across 340+ commercial projects
0%
On-Schedule Delivery
Tracked across all phases
0+
Years Commercial Only
No residential. Ever.
0%
Level 5 Capable
Every finisher on crew
The Process

Five Phases.
One Crew.

From chalk line to final cert — we own every phase in-house. No handoffs, no excuses, no change orders for scope we already priced.

Steel stud framing installation in large commercial building, workers measuring and placing metal studs in precise grid pattern
01
Steel Stud Systems

Layout & Framing

Snap lines, plumb walls, and precision steel stud layout from slab to deck. We read structural drawings, not guesses.

25 ga – 20 ga studUL Listed assembliesSeismic bracing incl.

Every stud is plumb within ⅛" — or we tear it out and reset it.

Workers hanging large gypsum drywall sheets on steel stud framing in commercial office space, using lift equipment at height
02
Gypsum Panel Installation

Board Hanging

High-reach lifts, stilts, and scaffold — we hang board at any height without sacrificing seam alignment or fire-assembly continuity.

Type X · Type C1-hr to 4-hr ratedSTC 44–63 available

Fire-rated assemblies documented and inspectable at every joint.

Skilled drywall finisher applying joint compound to taped seams with a wide knife, three-coat process visible on commercial wall
03
Joint Treatment Systems

Taping & Mudding

Three-coat process, properly timed. No shortcuts on dry time. No shrinkage cracks six months after turnover.

All-purpose · ToppingFiberglass mesh tapeCorner bead systems

We won't tape over green mud to hit a deadline — that's how callbacks happen.

340+ commercial projects completed. Not a single fire-assembly callback in 18 years.

Drywall finisher sanding smooth Level 5 surface under raking light in commercial space, dustless vacuum system attached
04
Surface Preparation

Finishing & Sanding

Skim coat, pole sand, vacuum. We finish under raking light so nothing hides. Level 5 is the standard, not the upgrade.

Level 3 · 4 · 5Veneer plaster optionDustless vacuum systems

Surfaces smooth enough to catch light — and pass your paint contractor's inspection.

Project manager conducting final inspection of completed commercial drywall installation, checking finish quality with flashlight
05
Punch & Turnover

Final Inspection

We walk the punch list before the GC does. Deficiencies get corrected before they become your problem — or your change order.

AHJ sign-off readyPhoto documentationFire cert package

You get a clean turnover package: photos, fire-assembly certs, and zero open items.

From the Field

GCs Who've
Seen the Work.

Not stock quotes. Real project managers on real builds who know the difference between a sub who bids and a sub who delivers.

"StudCrew came in, framed 80,000 square feet of tenant improvements in six weeks, and never missed a coordination meeting. Level 5 finish was flawless under the GC's raking light test."

Marcus Delgado, Senior Project Manager at Meridian Construction Group, professional headshot
Marcus Delgado
Senior Project Manager · Meridian Construction Group
280,000 SF Office Tower · Phoenix, AZ

"I've been burned by drywall subs who low-bid and change-order. StudCrew priced it right the first time. Fourteen months on a hospital build — zero change orders from their side."

Jennifer Okafor, VP of Construction at Apex Healthcare Builders, professional headshot
Jennifer Okafor
VP of Construction · Apex Healthcare Builders
Hospital Expansion · Denver, CO

"When the general asked for acoustic ratings on the conference suites, StudCrew already had the UL assembly documentation ready. That's the level of prep I need on a $40M project."

Ryan Tran, Owner's Representative at Cascade Development Partners, professional headshot
Ryan Tran
Owner's Representative · Cascade Development Partners
Class A Office Park · Seattle, WA

"Forty-foot ceilings in a retail shell, board hung in three days. The inspector signed off without a single deficiency note. That's what schedule certainty looks like."

Priya Nair, Project Executive at Stonegate Commercial, professional headshot
Priya Nair
Project Executive · Stonegate Commercial
Retail Shell Build-Out · Dallas, TX

"Their punch-list process is the cleanest I've seen. They walk the job before I do, fix everything, and hand me a photo package. Turnover meetings take twenty minutes."

Derek Hoffmann, General Superintendent at Iron Ridge Contractors, professional headshot
Derek Hoffmann
General Superintendent · Iron Ridge Contractors
Multi-Tenant Office Renovation · Chicago, IL

"We spec Level 5 on every high-end tenant improvement. Most subs say yes and deliver Level 3. StudCrew delivers what they bid. First time, every time."

Camille Bouchard, Director of Tenant Improvements at Northview Properties, professional headshot
Camille Bouchard
Director of Tenant Improvements · Northview Properties
Class A TI Package · Boston, MA

"StudCrew came in, framed 80,000 square feet of tenant improvements in six weeks, and never missed a coordination meeting. Level 5 finish was flawless under the GC's raking light test."

Marcus Delgado, Senior Project Manager at Meridian Construction Group, professional headshot
Marcus Delgado
Senior Project Manager · Meridian Construction Group
280,000 SF Office Tower · Phoenix, AZ

"I've been burned by drywall subs who low-bid and change-order. StudCrew priced it right the first time. Fourteen months on a hospital build — zero change orders from their side."

Jennifer Okafor, VP of Construction at Apex Healthcare Builders, professional headshot
Jennifer Okafor
VP of Construction · Apex Healthcare Builders
Hospital Expansion · Denver, CO

"When the general asked for acoustic ratings on the conference suites, StudCrew already had the UL assembly documentation ready. That's the level of prep I need on a $40M project."

Ryan Tran, Owner's Representative at Cascade Development Partners, professional headshot
Ryan Tran
Owner's Representative · Cascade Development Partners
Class A Office Park · Seattle, WA

"Forty-foot ceilings in a retail shell, board hung in three days. The inspector signed off without a single deficiency note. That's what schedule certainty looks like."

Priya Nair, Project Executive at Stonegate Commercial, professional headshot
Priya Nair
Project Executive · Stonegate Commercial
Retail Shell Build-Out · Dallas, TX

"Their punch-list process is the cleanest I've seen. They walk the job before I do, fix everything, and hand me a photo package. Turnover meetings take twenty minutes."

Derek Hoffmann, General Superintendent at Iron Ridge Contractors, professional headshot
Derek Hoffmann
General Superintendent · Iron Ridge Contractors
Multi-Tenant Office Renovation · Chicago, IL

"We spec Level 5 on every high-end tenant improvement. Most subs say yes and deliver Level 3. StudCrew delivers what they bid. First time, every time."

Camille Bouchard, Director of Tenant Improvements at Northview Properties, professional headshot
Camille Bouchard
Director of Tenant Improvements · Northview Properties
Class A TI Package · Boston, MA

"Forty-foot ceilings in a retail shell, board hung in three days. The inspector signed off without a single deficiency note. That's what schedule certainty looks like."

Priya Nair, Project Executive at Stonegate Commercial, professional headshot
Priya Nair
Project Executive · Stonegate Commercial
Retail Shell Build-Out · Dallas, TX

"Their punch-list process is the cleanest I've seen. They walk the job before I do, fix everything, and hand me a photo package. Turnover meetings take twenty minutes."

Derek Hoffmann, General Superintendent at Iron Ridge Contractors, professional headshot
Derek Hoffmann
General Superintendent · Iron Ridge Contractors
Multi-Tenant Office Renovation · Chicago, IL

"We spec Level 5 on every high-end tenant improvement. Most subs say yes and deliver Level 3. StudCrew delivers what they bid. First time, every time."

Camille Bouchard, Director of Tenant Improvements at Northview Properties, professional headshot
Camille Bouchard
Director of Tenant Improvements · Northview Properties
Class A TI Package · Boston, MA

"StudCrew came in, framed 80,000 square feet of tenant improvements in six weeks, and never missed a coordination meeting. Level 5 finish was flawless under the GC's raking light test."

Marcus Delgado, Senior Project Manager at Meridian Construction Group, professional headshot
Marcus Delgado
Senior Project Manager · Meridian Construction Group
280,000 SF Office Tower · Phoenix, AZ

"I've been burned by drywall subs who low-bid and change-order. StudCrew priced it right the first time. Fourteen months on a hospital build — zero change orders from their side."

Jennifer Okafor, VP of Construction at Apex Healthcare Builders, professional headshot
Jennifer Okafor
VP of Construction · Apex Healthcare Builders
Hospital Expansion · Denver, CO

"When the general asked for acoustic ratings on the conference suites, StudCrew already had the UL assembly documentation ready. That's the level of prep I need on a $40M project."

Ryan Tran, Owner's Representative at Cascade Development Partners, professional headshot
Ryan Tran
Owner's Representative · Cascade Development Partners
Class A Office Park · Seattle, WA

"Forty-foot ceilings in a retail shell, board hung in three days. The inspector signed off without a single deficiency note. That's what schedule certainty looks like."

Priya Nair, Project Executive at Stonegate Commercial, professional headshot
Priya Nair
Project Executive · Stonegate Commercial
Retail Shell Build-Out · Dallas, TX

"Their punch-list process is the cleanest I've seen. They walk the job before I do, fix everything, and hand me a photo package. Turnover meetings take twenty minutes."

Derek Hoffmann, General Superintendent at Iron Ridge Contractors, professional headshot
Derek Hoffmann
General Superintendent · Iron Ridge Contractors
Multi-Tenant Office Renovation · Chicago, IL

"We spec Level 5 on every high-end tenant improvement. Most subs say yes and deliver Level 3. StudCrew delivers what they bid. First time, every time."

Camille Bouchard, Director of Tenant Improvements at Northview Properties, professional headshot
Camille Bouchard
Director of Tenant Improvements · Northview Properties
Class A TI Package · Boston, MA

"StudCrew came in, framed 80,000 square feet of tenant improvements in six weeks, and never missed a coordination meeting. Level 5 finish was flawless under the GC's raking light test."

Marcus Delgado, Senior Project Manager at Meridian Construction Group, professional headshot
Marcus Delgado
Senior Project Manager · Meridian Construction Group
280,000 SF Office Tower · Phoenix, AZ

"I've been burned by drywall subs who low-bid and change-order. StudCrew priced it right the first time. Fourteen months on a hospital build — zero change orders from their side."

Jennifer Okafor, VP of Construction at Apex Healthcare Builders, professional headshot
Jennifer Okafor
VP of Construction · Apex Healthcare Builders
Hospital Expansion · Denver, CO

"When the general asked for acoustic ratings on the conference suites, StudCrew already had the UL assembly documentation ready. That's the level of prep I need on a $40M project."

Ryan Tran, Owner's Representative at Cascade Development Partners, professional headshot
Ryan Tran
Owner's Representative · Cascade Development Partners
Class A Office Park · Seattle, WA
Scope First. Contact Second.

Get Your
Real Bid.

Tell us what you're building before we ask who you are. We quote scope, not relationships.

Bid returned within 48 business hours
Fixed price — no change-order surprises
We'll tell you if it's not a good fit
Download Spec Sheet

Fire assembly ratings, STC values, finish level specs, and UL certifications — all in one PDF.

1
2
5,000 – 20,000 SF
< 5,000 SF5,000 – 20,000 SF20,000 – 75,000 SF75,000 – 250,000 SF250,000+ SF
3
4

No spam. We'll call once with a number — not a sales pitch.